Product description: Developed with fine molecular base materials, it is a multifunctional water-based sealing primer with strong penetrating power. Can effectively seal the wall, one-way breathable anti-alkali and weather resistance, high adhesion and other functions are dedicated to the primer for concrete anti-alkali sealing.
Product characteristics: milky white low viscosity emulsion polymer, transparent primer composed of fine particles. Has excellent resistance to water and saponification. The coating penetrates into the base layer to form a closed layer, which reduces the capillary water absorption of the base layer, is hydrophobic and breathable, strengthens the bearing capacity of the base layer, and improves the quality of the surface coating film. Highly concentrated, convenient for transportation and storage.
Water-based environmental protection products, low volatile matter and low emission, no pungent smell, no harmful substances added.
 Scope of application: All mineral substrates and solid old coating surfaces inside and outside buildings, such as various cement mortar plastering surfaces, concrete, lime plastering surfaces, gypsum products , cement blocks, etc. Ideal for highly alkaline concrete surfaces, long lasting to ensure a good looking finish.

Grass-roots treatment Before the wall, the dust, grease, mildew on the wall must be removed first, and the old loose coating should be eradicated, and the pinhole cracks on the wall should be filled and leveled. The new wall must be fully dried and maintained for at least 30 days to ensure that the pH value of the wall is lower than 10, and the moisture content of the base layer of the wall is less than 10%.

Technical parameters:

Temperature: Construction is prohibited below 5 ℃ (including grassroots, materials, and environment)
Humidity: Construction is prohibited when the relative humidity is above 85%
Theoretical brushing area: 10-12 ㎡/kg/pass
Dilution ratio: Immediately wash and air dry with water after use
Tool washing: 1. The wall is completely dry, PH< 10. Moisture< 10%。
2. Temperature≥ 5 ℃, air humidity< 70%。
Drying time: Surface dry: 60 minutes/25 ℃; Recoating time: Above 2 hours/25 ℃, apply topcoat within 7 days. During construction, air circulation should be maintained.
Coatings should be kept away from direct sunlight and heat sources; The barrel cover should be tightly covered during construction to prevent coating peeling
Storage: Store in a cool, clean, and dry place at 5-35 ℃. The remaining paint should be sealed and covered properly, as impurities can cause deterioration of the paint
If the product is unopened and properly stored, the shelf life is 18 months
Product packaging: 18KG/barrel