Home > Stucco>dry powder real stone coating
dry powder real stone coating
dry powder real stone coating

High-quality STUCCO imitation stone products are closer to natural stone decorative coatings. They are imitation stone products in two-component colored mortar with different numbers of natural gravel and stone powder as the main materials.

Features:

It is a water-resistant, alkali-resistant, weather-resistant, strong adhesion, high color retention, anti-ultraviolet water-based environmental protection architectural coating, with granite, marble, natural rock It has the decorative effect of stone, and has natural color, realistic texture, and hard stone-like finish, giving people a solemn, elegant and luxurious visual effect
1. Strong UV resistance, excellent Excellent weather resistance;
2. Excellent stain resistance. Corrosion resistance;
3. It has color retention, can prevent mildew and algae;
4. Excellent decoration. With slight extensibility, it can effectively cover tiny cracks and prevent cracking;
5. ECO ecological building materials, environmental protection wall decoration materials. No toxic, irritating or harmful substances will be produced during production, construction and later use, and will not cause damage to the ecological environment.
6. The real breathable wall material ensures that the wall is not eroded by water.

Monochrome sandstone effect sample

Monochrome sandstone effect sample

Multi color sandstone effect sample

Multi color sandstone effect sample

Two tone sandstone effect sample

Two tone sandstone effect sample

技术参数:

包装: 粉料25KG/包,浆料10KG/桶,混合后使用。涂布面积为8-10平米,厚浆型一次施工可达1.5-3mm漆膜厚度。
成分: 环保丙烯酸树脂、天然石粉、助剂及水。
色彩: 参阅西蒙真石漆专用色卡(可来样调色)。
墙体要求: 干燥、结实、平整、无粉尘、无没脂、无盐碱等异物,酸碱度低于10,含水率低于10%。
材料混合: 开桶后,将粉料与浆料按照比例混合搅拌均匀后使用,混合后的材料必须在3个小时内使用完毕,未使用完的材料必须废弃。
材料标准: JG/T24-2000
材料贮存: 存放于阴凉干燥处,远离火源,室温下密闭可贮存12个月。

 

施工说明:
1、基层处理:批刮西蒙找平腻子;
2、涂刷封闭底漆;
3、涂刷有色中涂底漆;
4、勾缝:以胶带依所需之图形宽度贴;
5、喷涂干粉真石涂层:一般不用稀释,采用专用真石漆喷枪喷漆两遍;
6、将勾缝之胶带除去,必要时将勾缝上色;
7、喷涂罩面清漆;
8、清洗:用清水及肥皂清洗施工后的用具。


施工条件:
1、 墙体完全干燥,PH<10,水分<10%。
2、 气温>5℃,空气湿度<85%。
3、 干结时间:表干2小时,实干4 8小时。
4、 重涂时间:24小时(25℃、50%相对湿度)。